当前位置:网站首页>图书 > 正文 >>

DLT5418-2009火电厂烟气脱硫吸收塔施工及验收规程(英文版)

图书信息

作者中国电力企业
出版社中国计划出版社
ISBN9787518201228
出版时间2015-06-01
字数10.5万
分类科技,工业技术,其他

读书简介

本书为中华人民共和国电力行业标准,由住房城乡建设部组织翻译的英文版,用于对外交流和国内对外的合作。中文版已于2009年出版。本标准规定了火电厂湿法烟气脱硫装置中吸收塔施工及验收的技术要求。本标准适用于火电厂湿法烟气脱硫装置中以普通碳素结构钢为主体结构材料、以玻璃鳞片树脂或橡胶为内防腐衬里的吸收塔施工及验收。

目录

书名页

版权页

Foreword

1 Scope

2 Normative References

3 Terms and Definitions

4 General

5 Acceptance of Materials and Finished Products

5.1 Acceptance of Metal Materials

5.2 Acceptance of Welding Materials

5.3 Acceptance of Non-metal Lining Materials

5.4 Acceptance of Finished Product Accessories

6 Prefabrication

6.1 General

6.2 Prefabrication of Bottom Plates

6.3 Prefabrication of Wall Plates

6.4 Prefabrication of Roof Plates

6.5 Member Prefabrication

6.6 Preassembly

7 Assembly

7.1 General

7.2 Acceptance of Foundation

7.3 Foundation Marking

7.4 Assembly of Base Plates

7.5 Assembly of Wall Plates

7.6 Installation of Stiffener

7.7 Assembly of Roof Plates

7.8 Assembly of Flue Gas Inlets & Outlets

7.9 Assembly of Accessories Welded to the Absorber Body

8 Welding

8.1 Welding Procedure Qualification(WPQ)

8.2 Welder Examination

8.3 Welding Preparations

8.4 Welding Operations

8.5 Recommended Welding Sequence

8.6 Visual Inspection of Welds

8.7 Nondestructive Testing(NDT)and Leak Testing of Welds

8.8 Defect Repairing

9 Acceptance of Absorber Body

9.1 General

9.2 Geometric Shape and Dimensional Inspection of Absorber Body

9.3 Water Filling Test

10 Anticorrosion of Glass Resin Flake

10.1 General

10.2 Matrix Treatment

10.3 Lining Construction

10.4 Lining Inspection

10.5 Repairing

11 Anticorrosion of Rubber Lining

12 Installation of Absorber internals

12.1 General

12.2 Installation of Spraying Banks

12.3 Installation of Mist Eliminator

12.4 Installation of Agitator System

13 Painting and Insulation

14 Acceptance Records

Appendix A(Normative)Preparation and Inspection of T-joint Fillet Weld Specimens

Appendix B(Informative)Handover and Acceptance Table

Article Explanation

1 Scope

2 Normative References

4 General

5 Acceptance of Materials and Finished Products

5.1 Acceptance of Metal Materials

5.2 Acceptance of Welding Materials

5.3 Acceptance of Non-metal Iining Materials

5.4 Acceptance of Finished Product Accessories

6 Prefabrication

6.1 General

6.2 Prefabrication of Bottom Plates

6.3 Prefabrication of Wall Plates

6.4 Prefabrication of Roof Plates

6.5 Member Prefabrication

6.6 Preassembly

7 Assembly

7.1 General

7.2 Acceptance of Foundation

7.3 Foundation Marking

7.4 Assembly of Base Plates

7.5 Assembly of Wall Plates

7.7 Assembly of Roof Plates

7.8 Assembly of Flue Gas Inlets & Outlets

7.9 Assembly of Accessories Welded to the Absorber Body

8 Welding

8.1 Welding Procedure Qualification(WPQ)

8.2 Welder Examination

8.3 Welding Preparation

8.4 Welding Operations

8.5 Recommended Welding Sequence

8.6 Visual Inspection of Welds

8.7 Nondestructive Testing(NDT)and Leak Test of Welds

8.8 Defect Repairing

9 Acceptance of Absorber Body

9.1 General

9.2 Geometric Shape and Dimensional Inspection of Absorber Body

9.3 Water Filling Test

10 Anticorrosion of Glass Resin Flake

10.1 General

10.2 Matrix treatment

10.3 Lining Construction

10.4 Lining Inspection

10.5 Repairing

11 Anticorrosion of Rubber Lining

12 Installation of Absorber Internals

12.1 General

12.2 Installation of Spraying Bank

12.3 Installation of Mist Eliminator

12.4 Installation of Agitator System

13 Painting and Insulation

14 Acceptance Records