当前位置:网站首页>图书 > 正文 >>

GB 51049-2014 电气装置安装工程 串联电容器补偿装置施工及验收规范(英文版)

图书信息

作者中华人民共和国住房和城乡建设部/组织编译
出版社中国计划出版社
ISBN9787518211500
出版时间2019-12-01
字数3.9万
分类科技,工业技术,其他

读书简介

中华人民共和国住房和城乡建设部 公 告 第642号 -------------------------------------------------------------------------------- 住房城乡建设部关于发布国家标准 《电气装置安装工程串联电容器补偿装置施工及验收规范》的公告   现批准《电气装置安装工程串联电容器补偿装置施工及验收规范》为国家标准,编号为GB51049-2014,自2015年8月1日起实施。

目录

书名页

版权页

Announcement of the Ministry of Housing and Urban-Rural Development of the Peoples Republic of China

Foreword

1 General Provisions

2 Terms

2.0.1 Series cpacitor installation(SC)

2.0.2 Fixed series capacitor installation(FSC)

2.0.3 Thyristor controlled series capacitor installation(TCSC)

2.0.4 SC Platform

2.0.5 Metal-oxide varistor(MOV)

2.0.6 Spark gap(GAP)

2.0.7 Damping device

2.0.8 Optical fiber column

2.0.9 Thyristor valve

2.0.10 Thyristor-controlled reactor

2.0.11 Ion exchange equipment

2.0.12 Deionized water

2.0.13 Insulation water pipe

3 Basic Requirements

4 SC Platform

4.1 Pre-Installation Inspection

4.2 Installation and Adjustment of Insulators for SC Platform

4.3 Assembling of SC Platform

4.4 Hoisting and Adjustment of SC Platform

4.5 Installation of SC Platform Accessories

5 Electric Equipment Installation

5.1 General Requirements

5.2 Capacitor

5.3 Metal-Oxide Varistor(MOV)

5.4 Spark Gap(GAP)

5.5 Damping Device

5.6 Optical Fiber Column

5.7 Current Transformer(CT),By-Pass Switch and Disconnector

5.8 Control and Protection System

6 Equipment Installation Specific to TCSC

6.1 Thyristor-Controlled Reactor(TCR)

6.2 Thyristor Valve Chamber

6.3 Voltage Divider

6.4 Water Cooling System

7 Acceptance of SC Project

Explanation of Wording in This Code

List of Quoted Standards

Explanation of Provisions

Descriptions

1 General Provisions

2 Terms

3 Basic Requirements

4 SC Platform

4.1 Pre-Installation Inspection

4.3 Assembling of SC Platform

4.4 Hoisting and Adjustment of SC Platform

5 Electric Equipment Installation

5.2 Capacitor

5.3 Metal-Oxide Varistor(MOV)

5.4 Spark Gap(GAP)

5.6 Optical Fiber Column

5.8 Control and Protection System

6 Equipment Installation Specific to TCSC

6.2 Thyristor Valve Chamber

6.3 Voltage Divider

6.4 Water Cooling System

7 Acceptance of SC Project